Product Description
3PP steel pipe, fully known as three-layer polypropylene anti-corrosion steel pipe, is a kind of pipe widely used in the field of pipeline transportation with excellent performance. Its anti-corrosion structure mainly consists of three layers: the inner epoxy powder, the middle adhesive layer, and the outer polypropylene layer.
The inner epoxy powder has a strong adhesion to the surface of the steel pipe, which can effectively prevent the steel pipe from being eroded by corrosive media and provide a good bonding foundation for subsequent coatings. The middle adhesive layer plays a crucial role in connecting the epoxy powder and the outer polypropylene. It has excellent compatibility with both, ensuring the integrity and stability of the anti-corrosion structure. The outer polypropylene has outstanding mechanical properties. Its high strength enables the 3PP steel pipe to withstand various external impacts during transportation and installation, avoiding damage caused by collisions, squeezes, and other factors. Moreover, polypropylene has high chemical stability, is wear-resistant and anti-aging. In harsh soil, water, and chemical media environments, it can protect the steel pipe for a long time, greatly extending the service life of the steel pipe.
Item |
Material |
Coating Material |
Epoxy Powder, Adhesion, Polyethylene Or Polypropylene, Cement Or IPN8710 Inside
|
Standard |
API 5L (PSL1, PSL2); ASTM A53 etc.
|
Grade |
Gr. B, X42, X46, X52, X60, X65, X70, X80; Q235B; Gr. C
|
Seam |
SMLS, SAW, SSAW; HSAW
|
Detailed Photos
In the production process, the manufacturing of 3PP steel pipes follows strict procedures. First, the steel pipe undergoes surface pretreatment to remove impurities such as rust and oil on the surface, making the surface reach a certain roughness to enhance the adhesion between the epoxy powder and the steel pipe. Subsequently, epoxy powder spraying, adhesive coating, and polypropylene extrusion winding are carried out in sequence. Each process has precise parameter control to ensure the thickness uniformity and quality stability of the anti-corrosion layer.
Applications
Due to its excellent performance, 3PP steel pipes are widely used in long-distance pipeline projects in the fields of petroleum, natural gas, and chemical industry. In these fields, pipelines need to withstand the erosion of complex environments and transported media for a long time. 3PP steel pipes can provide reliable protection for the transportation process, reduce maintenance costs, and improve the safety and operation efficiency of the pipeline system.
Packaging & Shipping
Inner Packaging
- Plastic Film Wrapping: For anti - corrosion steel pipes exported to areas with high humidity, the plastic film can avoid the initial corrosion risk caused by humidity problems during loading and transshipment.
- Rust - Preventive Paper Wrapping: For anti - corrosion steel pipes used in marine engineering, for instance, they may come into contact with humid marine air during transportation, and the use of rust - preventive paper can provide additional protection.
Outer Packaging
- Steel Strap Bundling: After arranging multiple anti - corrosion steel pipes neatly, steel straps are used for horizontal and vertical bundling and fixing.
- Wooden Pallet Loading: Steel pipes are usually placed on customized wooden pallets, and the size of the wooden pallets is designed according to the length and quantity of the steel pipes.
- Wooden Box Packaging: For some small - sized or high - value anti - corrosion steel pipes, wooden box packaging may be adopted.
Identification and Marking
- Product Information Labeling: The product information such as the specifications, models, quantity, and material of the anti - corrosion steel pipes is marked at an obvious position on the packaging. These labels are usually printed with non - fading ink, which is convenient for quickly identifying and checking the goods information during transportation and customs clearance.
- Transportation Warning Signs: According to the characteristics of the steel pipes and transportation requirements, corresponding warning signs such as "Fragile Goods", "Moisture - proof", and "Upward" are posted. These signs can remind handlers and transporters to pay attention to protecting the goods during operation to ensure safe transportation.
Certifications
Our on-site management is stringently implemented in strict compliance with the international standard quality management system(API, ASME, ANSI, EN, DIN, JIS, GOST, GB/T, ISO, etc. Our products have successfully passed the inspections and obtained approvals from esteemed international authoritative third-party organizations, namely SGS, BV, MOODY, and TUBOSCOPE.
Company Profile
Established in 1997, HD STEEL GROUP is strategically situated in Yanshan industrial zone, Cangzhou City, Hebei Province, renowned as the 'Pipe Fitting Capital'.
Our group is engaged in a diverse range of activities, with a specialization in the manufacturing of pipe fittings, flanges, anti-corrosion line pipes, steel inventory management, as well as domestic and international sales operations. We are dedicated to offering comprehensive one-stop solutions for steel pipe products to a global clientele. Boasting state-of-the-art technology in the R&D and production of steel pipe fittings and flanges, which is at the forefront both domestically and internationally, we are also equipped with advanced and comprehensive testing facilities.
Our company steadfastly adheres to the principles of 'Customer First', 'Quality First', and 'Credibility First'. Leveraging our robust economic strength, advanced management expertise, and premium service quality, we are eager to forge a long-term and mutually beneficial cooperative partnership with you, aiming for shared prosperity and success.
FAQ
Q:Are you trading company or manufacture?
A:Both. We have 2 production area in China and welcome to visit our factory!
Q:Can I have a trial order only for several tons?
A:We can ship the regular specifications with LCL service.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free, with the cost of freight paid by customer.
Q:How long is your delivery time?
A:Generally it is 3-5 days if goods are in stock. or around 30days if the goods are not in stock and it is according to order requirement.
Q:What is your terms of payment?
A: Payment<=1000USD, 100% in advance.
Payment>=1000USD, 30% T/T in advance ,balance before shippment. Or L/C at sight (For big order, LC at 30-90days can be acceptable).